The Kenya National Highways Authority (KeNHA) has announced a planned road closure of the section between Makupa Bridge and Changamwe Interchange on the Mombasa-Nairobi Highway. The closure, set to run from Sunday, November 17, 2024, to Sunday, December 1, 2024, is aimed at facilitating crucial road construction and drainage improvements.
Purpose of the Closure
This 15-day closure is intended to enhance road connectivity and safety by allowing uninterrupted progress on construction and drainage systems. These upgrades are expected to ensure smooth traffic flow and improved infrastructure once completed.
Affected Areas
The closure specifically impacts the stretch between Makupa Bridge and the Changamwe Interchange, a key section of the Mombasa-Nairobi Highway that serves as a major artery for transport and logistics in the region.
Traffic Management Plan
KeNHA has urged motorists to adhere to the proposed traffic management plan, which includes:
- Designated detours to minimize disruptions.
- Temporary signage to guide drivers safely around the construction zone.
- Collaboration with traffic authorities to manage congestion and ensure safety.
Advice to Motorists
- Plan routes in advance to avoid delays.
- Allow extra travel time when navigating alternative routes.
- Stay updated with real-time traffic announcements via local media and KeNHA’s communication channels.
This temporary closure aligns with KeNHA’s broader efforts to improve Kenya’s highway infrastructure and ensure long-term efficiency for both local and transit traffic.